Skip to content

Patata Street Industrial Development EIR

Ascent is completing an EIR for a state-of-the-art modern industrial warehouse and distribution facility in the City of South Gate. The project involves the construction of an approximately 450,000 square foot warehouse with cold storage that is designed to be certified Leadership in Energy and Environmental Design (LEED) Gold with roof-mounted solar PV arrays.

Big Bear Mountain Resort

SE Group prepared the 2020 Master Development Plan (MDP) for the Big Bear Mountain Resort, which includes both the Bear Mountain and Snow Summit ski areas. A key component of the MDP is expansion of the US Forest Service Special Use Permit boundary by approximately 300 acres to connect the Bear Mountain Ski Area and Snow Summit Ski Area locations. In addition, construction of seven new lifts (two new lifts at Bear Mountain, two new interconnect lifts, three new lifts at Snow Summit) and removal of eight existing lifts (two lifts from Bear Mountain, six lifts from Snow Summit) have been identified as part of the MDP.

Kyle Canyon Biological Surveys

NV Energy’s electrical service area includes the community of Mt. Charleston in Kyle Canyon, approximately 35 miles west-northwest of Las Vegas on National Forest System land managed by the Humboldt-Toiyabe National Forest, Spring Mountains National Recreation Area. Some special use permits on lands managed by the US Forest Service had expired and needed to be renewed as part of the consolidated master special use permit. Ascent’s biological resources team conducted field surveys for golden eagle, northern goshawk, flammulated owl, and other raptors; bat roosting habitat and acoustical surveys; sensitive butterfly larval host and nectar plant surveys and mapping; snag mapping; TES plant surveys; and invasive and nonnative plant species surveys.

Back To Top